WLA (Wind Limited Access)

Offshore Limited Access

Offshore Limited Access OFL (3 h 30 min)

Aim: The aims of this Offshore Limited Access Module are, to build upon the skills and knowledge gained in the onshore module, giving participants the ability to act safely and responsibly when participating in a supervised visit to an offshore WTG environment during normal operations.

PROGRAMME: Offshore Limited Access
1. Measures to prevent injury during training
1.1 Control measures and warm-up
2. Practical Sea Survival
2.1 Correct donning and use of LSA and PPE
2.2 Risks related to evacuation and release into water
2.3 Man overboard procedures
2.4 Controlled entry into the water
2.5 Individual and collective swimming techniques
2.6 Correct usage of a life raft
2.7 Emergency descent to water by constant rate descender
3. Safe travel and transfer (theoretical)
3.1 Hazards related to the different types of transfers
3.2 Safe transfer from vessel to WTG
3.3 Safe transfer from vessel to vessel and dock to vessel
4. Transfer Practical
4.1 Procedures for transfer between crew transfer vessel and wind turbine generator transition piece
4.2 Safe transfer between crew transfer vessel and wind turbine generator transition piece
5. Training review
5.1 Feedback session
OFL
Module OFL Offshore Limited Access
Duration:3 h 30 min (1/2 day)
Programme OFL:Sections 1 to 5
Max. students:12 people per Edition
Prerequisites:ONL
Certificate Validity: 24 months
Vallecas (Madrid) — Spain
Total HSE
Telf.: +34 664 681 385 — [email protected]
PREMIUM
Andosilla (Navarra) — Spain
Total HSE
Telf.: +34 664 681 385 — [email protected]
SELECT
Las Palmas (Islas Canarias) — Spain
SEPROM
Telf.: +34 664 681 385 — [email protected]
SELECT
Redondela (Galicia) — Spain
Verticalia Formación
Telf.: +34 664 681 385 — [email protected]
SELECT
San José — Costa Rica
Desarrollos Floruma
Telf.: +506 2282-7468 — [email protected]
SELECT
Santiago de Chile — Chile
TTR Chile
Telf.: +569 42281266 — [email protected]
SELECT